Capture
Receive the fail result and identify the product associated with that decision.
Detect, track, reject and prove
Independent confirmation closes the gap between an inspection fail signal and evidence that the correct product was removed.
Reject verification is an independent check that the product identified as failed reached the reject area. The controls know which product should be removed, monitor the reject event and expect a confirmation within a defined window. If proof is missing, the system can alarm, stop the line and require an authorised investigation.
Verification does not replace a sound reject mechanism; it proves that the complete sequence achieved its intended result.
Receive the fail result and identify the product associated with that decision.
Maintain product position using timing, sensors or encoder-based distance tracking.
Operate the selected actuator inside the correct product window.
Receive independent evidence that the failed product entered the secure reject route.
A sensor expects the rejected product or its passage into the reject chute or bin.
Feedback confirms that a pusher, flap or diverter completed the commanded movement.
Pneumatic pressure below the agreed threshold can prevent operation and initiate a line stop.
Bin-level sensing prevents accepted production continuing when secure capacity is unavailable.
Door or bin access can be monitored so rejected product cannot re-enter the good stream unnoticed.
Downstream accumulation and blocked-product conditions can be detected before tracking becomes unreliable.
The response is defined by the customer's risk assessment and quality procedure. Typical actions include stopping the conveyor, raising audible and visual alarms, recording the event, holding subsequent product and requiring an authorised reset after the affected product window has been investigated.
Commissioning should prove normal rejection and deliberately test monitored faults such as a missing confirmation, low air pressure, full bin or opened access point. The agreed tests and recovery steps should be understandable to production and quality personnel.
The final architecture must match the inspection risk and production process.
No. An actuator sensor may prove that the mechanism moved, while a separate product sensor can confirm that the failed product reached the reject route.
Often, yes. Feasibility depends on product spacing, sensor access, conveyor layout, control interfaces and the available reject zone.
Yes, where interfaces are available and agreed. Reject, confirmation, fault and system-ready signals can be incorporated into the project scope.
Start with your product and line
Send us your line speed, product dimensions, inspection equipment and a short production video. We will help define the right reject method and controls.
Share the product, throughput, inspection trigger and available conveyor space. We’ll help identify a practical next step.
Request a line review →01865 416657